Our Gallery
Poughkeepsie, NY Hospital
Inspection of 2 year old shower pan and drain installation. Inspection revealed improper materials used and non-compliant installation methods.
New Jersey Commercial Pool Concrete Core Testing and Inspection
Removing a concrete core and inspecting subsurface soil conditions. Core depth is measured and taken for offsite compression and petrographic analysis.
Hospital in Middletown, NY
Concrete was cut and removed in a critical environment. Only electric tools were allowed and all work was tightly controlled to eliminate dust.
School in Middlebrook, CT
Performing RH and MVER testing for new flooring installation. This ensures that the moisture present in the concrete slab is within specifications for the flooring and adhesive to be installed.
NY Manufacturing Plant
Prior to removing concrete cores, we scanned the area to identify potential embedded objects. We also identified the size and grid layout of the reinforced steel.
Commercial Pool in New Jersey
Several concrete cores were removed and tested. Subsurface conditions documented and inspected for uniformity and structural integrity.
Montefiore Hospital in NY
Testing new concrete for RH, surface moisture, MVER, core and surface temp, and surface PH readings.
Hospital in Poughkeepsie, NY
Stripping, and deep cleaning of terrazzo. Then the application of a specialized nano-ceramic finish with high coefficient of friction to eliminate slip and falls.
Hospital, Middletown, NY
Concrete was scanned and marked for new trenches to be cut. We identified metal pipe in the slab.